Related claims (18)
- The site says recovery of the Sistema Electroenergético Nacional in Las Tunas and attention to municipal energy councils are a priority.
- A linked news item states that the Unión Eléctrica forecasts "1990 MW de afectación para la máxima demanda de hoy."
- The site links to news about energy transition amid fuel shortages and about the recovery of electric supply and reactivation of essential services in Las Tunas.
- The site navigation includes services and procedures for migration, identity cards, driving licenses, courts, taxation, consumer registration, employment, transport, rail, agriculture, communications, commerce, housing, tourism, pharmacies and optics, and online services.
- The site links to an article titled "Afectaciones al servicio eléctrico para hoy jueves 7" and another titled "Afectaciones al servicio eléctrico para hoy miércoles 4".
- The site links to multiple electricity updates from Unión Eléctrica, including forecasts of "2.147 MW" and "1.870 MW" of nighttime peak-hour impacts and a separate estimate of "2080 MW" for maximum demand.
- Unión Eléctrica reported an affectation of 2,147 MW.
- Unión Eléctrica forecast 1,990 MW of affectation for today's peak demand.
- The Ministry of Energy and Mines page says the Unión Eléctrica issues daily reports on the situation of the Servicio Eléctrico Nacional (SEN).
- For the peak period, Unit 3 of CTE Renté is expected to enter with 45 MW; the maximum-demand forecast is 1240 MW of availability against 3200 MW of demand, implying a deficit of 1960 MW and an estimated impact of 1990 MW.
- Thermal generation limitations totaled 354 MW out of service.
- The bulletin lists maintenance at Unit 5 of CTE Mariel, Unit 6 of CTE Renté, and Unit 5 of CTE Nuevitas.
- The bulletin lists faults at CTE Antonio Guiteras, Unit 2 of CTE Lidio Ramón Pérez, and Units 3 and 5 of CTE Antonio Maceo.
- For the midday period, an impact of 1600 MW is estimated.
- At 06:00, SEN availability was 1195 MW, demand was 2740 MW, and 1553 MW were affected.
- The 54 new solar photovoltaic parks produced 3237 MWh and delivered a maximum of 466 MW at midday.
- The maximum impact from generation capacity deficit the previous day was 2010 MW at 22:00 hours.
- On 2026-05-26, Cuba's electrical system was affected by a capacity deficit for 24 hours the previous day and remained affected throughout the overnight hours.